Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-69000-00002245

Header Information

Bid Number: S-69000-00002245 Description: ENGINEERING SERVICES FOR WAGEMAN DAM Bid Opening Date: 03/25/2022 02:00:00 PM
Purchaser: Salem Opeifa Organization: Water Resources Department
Department: 69001 - ASD - Business Services Location: 2110 - ASD - Fiscal Services
Fiscal Year: 23 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  02/25/2022 12:30:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam. The conduit through Wageman Dam is a thin walled steel pipe that dates to 1969 making the conduit
Ship-to Address: Bill-to Address: Print Format:
File Attachments: Additional File Information
Solicitation Document
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: A and E
Procurement Method: Competitive Sealed Bid
Amendments:
Amendment # Amendment Date Amendment Note
1 03/16/2022 02:51:21 PM Attachment File Changes: Header 1. File 'Additional File Information': File 'Additional File Information' added .

Item Information

Item # 1:   ( 925  -  23 )   The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam The conduit through Wageman Dam is a thin walled steel pipe that is more than fifty years old well past the designed life The last time the conduit was operated, water was observed exiting the dam around the outside of the conduit. This indicates there are holes in the conduit As a result the conduit is no longer operated. In addition, the size of the conduit is insufficient so slip lining the conduit is not an option The conduit needs to be replaced or an alternative means to drain the reservoir needs to be developed
NIGP Code: 925-23
   Dam Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
0.1   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 925  -  17 )   The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam The conduit through Wageman Dam is a thin walled steel pipe that is more than fifty years old well past the designed life The last time the conduit was operated, water was observed exiting the dam around the outside of the conduit. This indicates there are holes in the conduit As a result the conduit is no longer operated. In addition, the size of the conduit is insufficient so slip lining the conduit is not an option The conduit needs to be replaced or an alternative means to drain the reservoir needs to be developed
NIGP Code: 925-17
   Civil Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
0.01   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 925  -  35 )   The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam The conduit through Wageman Dam is a thin walled steel pipe that is more than fifty years old well past the designed life The last time the conduit was operated, water was observed exiting the dam around the outside of the conduit. This indicates there are holes in the conduit As a result the conduit is no longer operated. In addition, the size of the conduit is insufficient so slip lining the conduit is not an option The conduit needs to be replaced or an alternative means to drain the reservoir needs to be developed
NIGP Code: 925-35
   Environmental Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
0.1   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 925  -  30 )   The purpose of this analysis contract is to fund an options evaluation that will inform decision making to address the issue with the conduit of Wageman Dam The conduit through Wageman Dam is a thin walled steel pipe that is more than fifty years old well past the designed life The last time the conduit was operated, water was observed exiting the dam around the outside of the conduit. This indicates there are holes in the conduit As a result the conduit is no longer operated. In addition, the size of the conduit is insufficient so slip lining the conduit is not an option The conduit needs to be replaced or an alternative means to drain the reservoir needs to be developed
NIGP Code: 925-30
   Earthquake-Seismic Engineering
Qty Unit Cost UOM Total Discount Amt. Total Cost
0.1   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status