Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-73000-00004635

Header Information

Bid Number: S-73000-00004635 Description: ODOT District 14 Rock Production 2023 Bid Opening Date: 11/17/2022 10:00:00 AM
Purchaser: Kevin D Cassidy Organization: Department of Transportation
Department: 7304240 - Region 5 Location: 5109 - Austin Section
Fiscal Year: 21 Allow Electronic Quote: Yes
Alternate Id:   Required Date: 10/11/2022 Available Date :  10/31/2022 09:41:36 AM
Info Contact: Kevin Cassidy kevin.d.cassidy@odot.oregon.gov (541) 207-7225 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Blanket
Begin Date: 11/28/2022 End Date: 06/30/2023
Pre Bid Conference: None
Bulletin Desc: Estimated project budget - $900,000 to $1,000,000 Temp Traffic Control - Provide Aggregate in stockpiles in specified locations - Perform Incidental work - Substantial Completion June 23, 2023.
Ship-to Address: Region 5
3012 Island Ave
Building B
La Grande, OR 97850
US
Email: Region5AP@odot.oregon.gov
Phone: (541) 963-3177
Bill-to Address: Region 5
3012 Island Ave
Building B
La Grande, OR 97850
US
Email: Region5AP@odot.oregon.gov
Phone: (541) 963-3177
Print Format: Bid Print New
File Attachments: D14 Savage Quarry 2023 - Geology Narrative Packet~1.pdf
Intent to Award Tabulation.pdf
Invitation to Bid~6.pdf
Bid Cover.docx
Sample Contract~3.pdf
D14 Savage Quarry 2023 - Compiled Plans and Standard Drawings.pdf
D14 Savage Quarry 2023 - Compiled Specs.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Trade Services
Procurement Method: Competitive Sealed Bid
Amendments:
Amendment # Amendment Date Amendment Note
1 10/31/2022 10:42:48 AM Revised Sample Contract to include Bid information Attachment File Changes: Header 1. File 'Sample Contract~1.pdf': File 'Sample Contract~1.pdf' deleted . 2. File 'Sample Contract~3.pdf': File 'Sample Contract~3.pdf' added .
2 11/02/2022 04:34:27 PM Replaced Geology Narrative - former file was not able to open for viewing. Attachment File Changes: Header 1. File 'D14 Savage Quarry 2023 - Geology Narrative Packet.pdf': File 'D14 Savage Quarry 2023 - Geology Narrative Packet.pdf' deleted . 2. File 'D14 Savage Quarry 2023 - Geology Narrative Packet~1.pdf': File 'D14 Savage Quarry 2023 - Geology Narrative Packet~1.pdf' added .
3 11/17/2022 10:23:25 AM This is to serve notice of Intent to Award to 4-R Eauipment - Bid tabulation can be found in the attachments folder. Attachment File Changes: Header 1. File 'Intent to Award Tabulation.pdf': File 'Intent to Award Tabulation.pdf' added .

Item Information

Item # 1:   ( 913  -  27 )   MOBILIZATION
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 913  -  27 )   POLLUTION CONTROL
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 913  -  27 )   GRADED MEDIUM (3/8" - NO. 4) AGGREGATE MATERIAL IN STOCKPILE
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
25000.0   CUYD - Cubic yard    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 913  -  27 )   SANDING AGGREGATE MATERIAL IN STOCKPILE
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
11000.0   CUYD - Cubic yard    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status