Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-73000-00012560

Header Information

Bid Number: S-73000-00012560 Description: ESB OR8 EB at MP 11.12 Bus Pad Bid Opening Date: 01/29/2025 03:00:00 PM
Purchaser: Ivory Williams Organization: Department of Transportation
Department: 7304220 - Region 1 Location: 1200 - District 2B Manager
Fiscal Year: 25 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  01/15/2025 06:12:33 PM
Info Contact: Contact: Ivory Williams ivory.williams@odot.oregon.gov 503-910-9609 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Mandatory pre-bid meeting: Wednesday, January 22, 2025 at 11:00 am. 9200 SE Lawnfield Rd. Clackamas, OR 97015
Bulletin Desc: Only quotes from certified, at the time of bid, ESB firms will be considered for award of a contract under this RFCQ. Contract requires Contractor furnish and install all construction material related to construct one bus pad and furnish and provide traffic control
Ship-to Address: Sylvan Section
6000 SW Raab Rd.
Portland, OR 97221
US
Email: Robert.L.RAKE@odot.oregon.gov
Phone: (503) 229-5201
Bill-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
US
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
Print Format: Bid Print New
File Attachments: 00012560_Request for Competetive Quotes.docx
00012560_ESB_RFCQ_Attachments.docx
Exhibit 1 - Special Provisions~3.pdf
00012560 Q and A One.docx
SupplierBidResponse~2.pdf
00012560 Pre-Bid Conference Sign In Sheet.pdf
00012560 Pre Bid Meeting Agenda.docx
00012560 RFCQ Addendum.docx
Revised 00012560_RFCQ.docx
Revised Exhibit 1 - Special Provisions.pdf
00012560 Q and A Two.docx
Preliminary Bid Results~31.xlsx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Public Improvement
Procurement Method: Intermediate Procurement
Questions:
Question # Print Sequence Required Question Response
1 1.0 Yes Did you remember to submit the bid bond with your bid? Your bid will be rejected without it.                    
2 2.0 Yes Did you submit the First Tier Subcontractor Disclosure Form with your bid? If not, it is due via email to the single point of contact within 2 hours of bid closing. If the form is not turned in within this timeframe your bid will be rejected.                    
Amendments:
Amendment # Amendment Date Amendment Note
1 01/22/2025 03:31:59 PM 1. Post pre-bid meeting sign-in sheet and agenda. 2. Post Q&A document and OregonBuys user guide. Please download the documents in the attachments. Attachment File Changes: Header 1. File '00012560 Q and A One.docx': File '00012560 Q and A One.docx' added . 2. File 'SupplierBidResponse~2.pdf': File 'SupplierBidResponse~2.pdf' added . 3. File '00012560 Pre-Bid Conference Sign In Sheet.pdf': File '00012560 Pre-Bid Conference Sign In Sheet.pdf' added . 4. File '00012560 Pre Bid Meeting Agenda.docx': File '00012560 Pre Bid Meeting Agenda.docx' added .
2 01/24/2025 03:37:26 PM 1. Revise RFCQ clerical error. 2. Revise Exhibit 1 - Special Provisions page 17 3. Add Q&A Two document Attachment File Changes: Header 1. File '00012560 RFCQ Addendum.docx': File '00012560 RFCQ Addendum.docx' added . 2. File 'Revised 00012560_RFCQ.docx': File 'Revised 00012560_RFCQ.docx' added . 3. File 'Revised Exhibit 1 - Special Provisions.pdf': File 'Revised Exhibit 1 - Special Provisions.pdf' added . 4. File '00012560 Q and A Two.docx': File '00012560 Q and A Two.docx' added .
3 01/29/2025 03:24:26 PM Post preliminary bid results. Attachment File Changes: Header 1. File 'Preliminary Bid Results~31.xlsx': File 'Preliminary Bid Results~31.xlsx' added .
4 01/29/2025 03:53:15 PM This shall serve as ODOT's notice on intent to award a contract to Mid-Valley excavation.

Item Information

Item # 1:   ( 750  -  59 )   Mobilization
NIGP Code: 750-59
   Mixers, Mobile, Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Ship-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
   
 
Item # 2:   ( 750  -  59 )   TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC
NIGP Code: 750-59
   Mixers, Mobile, Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Ship-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
   
 
Item # 3:   ( 750  -  59 )   24 INCH SUBGRADE STABILIZATION
NIGP Code: 750-59
   Mixers, Mobile, Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
45.0   SQUARE YAR - Square Yard    
Manufacturer: Brand: Model:
Make: Packaging:
 
Ship-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
   
 
Item # 4:   ( 750  -  59 )   CONCRETE BUS PADS
NIGP Code: 750-59
   Mixers, Mobile, Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
1800.0   SQFT - Square foot    
Manufacturer: Brand: Model:
Make: Packaging:
 
Ship-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
   
 
Item # 5:   ( 750  -  59 )   THERMOPLASTIC, EXTRUDED, SURFACE, PROFILED
NIGP Code: 750-59
   Mixers, Mobile, Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
200.0   LINEAR FOO - Linear Foot/Feet    
Manufacturer: Brand: Model:
Make: Packaging:
 
Ship-to Address: District 2B
9200 SE Lawnfield Rd.
Clackamas, OR 97015
Email: Stacy.STUBBLEFIELD@odot.oregon.gov
Phone: (971) 673-1343
   
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status