Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-73000-00014905

Header Information

Bid Number: S-73000-00014905 Description: US95: Idaho State Line - Rome Hill Chip Seal Project Bid Opening Date: 10/30/2025 10:00:00 AM
Purchaser: David Dethloff Organization: Department of Transportation
Department: 7304240 - Region 5 Location: 5108 - Jordan Valley Sect
Fiscal Year: 26 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  10/02/2025 11:19:26 AM
Info Contact: Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: No Pre Bid Meeting Established For This Project
Bulletin Desc: Pavement preservation project (Chip Seal) along US 95 From the Idaho State line to Rome. (Mileposts 0 to 51.5.)
Ship-to Address: Region 5
3012 Island Ave
Building B
La Grande, OR 97850
US
Email: Region5AP@odot.oregon.gov
Phone: (541) 963-3177
Bill-to Address: Region 5
3012 Island Ave
Building B
La Grande, OR 97850
US
Email: Region5AP@odot.oregon.gov
Phone: (541) 963-3177
Print Format: Bid Print New
File Attachments: 00014905 Preliminary Results.xlsx
00014905 Intent To Award.xlsx
00014905 Addendum 1.docx
00014905 Invitation.To.Bid.docx
00014905 Attachment A Special Provisions.pdf
00014905 Attachment B Plans..pdf
00014905 Attachment C Bid Pricing Form.xlsx
00014905 Attachment D Material Source Narrative.pdf
00014905 Attachment E Apprenticeship Requirements.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Public Improvement
Procurement Method: Competitive Sealed Bid
Questions:
Question # Print Sequence Required Question Response
1 1.0 Yes Did you mark your attachments confidential?                    
2 2.0 Yes Did you enter bid pricing in the Items tab and also complete and attach the bid pricing form.                    
Amendments:
Amendment # Amendment Date Amendment Note
1 10/22/2025 06:15:35 AM Addendum 1 Extends the bid closing date, extends the substantial and final completion dates, and also updates section 00220 in attachment A special provisions. See Addendum 1 in the attachments tab for details. Header 1. Bid Opening Date changed from "10/23/2025 10:00:00 AM" to "10/30/2025 10:00:00 AM". Attachment File Changes: Header 1. File '00014905 Addendum 1.V1.docx': File '00014905 Addendum 1.V1.docx' added . 2. File '00014905 Invitation.To.Bid.docx': Order changed from "1" to "2". 3. File '00014905 Attachment A Special Provisions.pdf': Order changed from "2" to "3". 4. File '00014905 Attachment B Plans..pdf': Order changed from "3" to "4". 5. File '00014905 Attachment C Bid Pricing Form.xlsx': Order changed from "4" to "5". 6. File '00014905 Attachment D Material Source Narrative.pdf': Order changed from "5" to "6". 7. File '00014905 Attachment E Apprenticeship Requirements.docx': Order changed from "5" to "7".
2 10/22/2025 06:23:03 AM Internal addendum to place correct version of addendum 1 into attachments. No material changes regarding this addendum. Internal Only. Attachment File Changes: Header 1. File '00014905 Addendum 1.V1.docx': File '00014905 Addendum 1.V1.docx' deleted . 2. File '00014905 Addendum 1.docx': File '00014905 Addendum 1.docx' added .
3 10/30/2025 12:14:55 PM Preliminary Bid Results are now posted and available in OregonBuys in the attachments Tab. ODOT is reviewing for Award Determination. Attachment File Changes: Header 1. File '00014905 Preliminary Results.xlsx': File '00014905 Preliminary Results.xlsx' added .
4 11/03/2025 07:38:29 AM ODOT's intent to award has been issued and can be found in the attachments tab in OregonBuys. Attachment File Changes: Header 1. File '00014905 Intent To Award.xlsx': File '00014905 Intent To Award.xlsx' added .

Item Information

1-5 of 22
1  2  3  4  5 
Item # 1:   ( 913  -  27 )   MOBILIZATION
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 968  -  84 )   TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 968  -  84 )   TEMPORARY SIGNS
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
3400.0   SQFT - Square foot    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 968  -  84 )   PORTABLE CHANGEABLE MESSAGE SIGNS
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
2.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 968  -  84 )   FLAGGERS
NIGP Code: 968-84
   Traffic Control Services, Including Placement and Removal of Control Devices
Qty Unit Cost UOM Total Discount Amt. Total Cost
1000.0   HOUR/HOUR - Hour(s)    
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 22
1  2  3  4  5 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status