Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-73000-00014937

Header Information

Bid Number: S-73000-00014937 Description: ER 2025 I-5 SB MP 109.5 (Serpentine Rockfall) Gabion Wall Repairs Bid Opening Date: 10/01/2025 02:00:00 PM
Purchaser: Terri Sinclair-Olson Organization: Department of Transportation
Department: 7304230 - Region 3 Location: 3200 - Main Dist 7 ADM
Fiscal Year: 26 Allow Electronic Quote: Yes
Alternate Id:   Required Date: 09/17/2025 Available Date :  09/17/2025 03:26:43 PM
Info Contact: Contact Blake Howren at (541) 315-1943 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A mandatory pre-quote conference will be held Thursday September 25 at 1:30pm onsite at SB MP 109.5 behind the gabion wall. See RFCQ document for more information.
Bulletin Desc: Supply materials, equipment, labor, and incidentals necessary to repair and realign the gabion wall damaged by rockfall near MP 109.5 SB along Interstate 5 (I-5). Perform additional and incidental work as noted in the Contract plans and specifications and as directed.
Ship-to Address: Region 3
3500 NW Stewart Parkway
Roseburg, OR 97470
US
Email: OdotRoseburgAdmin@odot.oregon.gov
Phone: (541) 957-3500
Bill-to Address: Region 3
3500 NW Stewart Parkway
Roseburg, OR 97470
US
Email: OdotRoseburgAdmin@odot.oregon.gov
Phone: (541) 957-3500
Print Format: Bid Print New
File Attachments: 00014937 Request for Competitive Quotes.docx
Exhibit A Special Provisions and Specifications.docx
ATT A Project Wage Rates.pdf
ATT B FHWA Form 1273.pdf
ATT C Contract Closeout Compliance Checklist.doc
Sample Contract~51.docx
00014937_Prequote_Signup.pdf
RFCQ Bid Results.xlsx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Public Improvement
Procurement Method: Competitive Sealed Bid
Amendments:
Amendment # Amendment Date Amendment Note
1 09/17/2025 04:11:50 PM Replaced Sample Contract to delete duplicate insurance requirements. Insurance requirements are in the Supplemental General Conditions section of the Sample Contract. Attachment File Changes: Header 1. File 'Sample Contract~50.docx': File 'Sample Contract~50.docx' deleted . 2. File 'Sample Contract~51.docx': File 'Sample Contract~51.docx' added .
2 09/26/2025 07:46:39 AM Prebid signup sheet. Bidders must have attended to submit a bid. Also, clarification: ODOT does NOT have a stockpile of gabion fill material (rock) on hand to utilize on the project Attachment File Changes: Header 1. File '00014937_Prequote_Signup.pdf': File '00014937_Prequote_Signup.pdf' added .
3 10/02/2025 11:27:56 AM Preliminary results and Intent to Award. ODOT intends to award a Contract to Hayes Construction. Attachment File Changes: Header 1. File 'RFCQ Bid Results.xlsx': File 'RFCQ Bid Results.xlsx' added .

Item Information

Item # 1:   ( 913  -  27 )   Total Project Cost
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   PROJECT(s) - Project    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status