Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-73000-00014943

Header Information

Bid Number: S-73000-00014943 Description: ESB OR-140 Warner Highway (#431)Milepost Route Identifiers Bid Opening Date: 10/16/2025 10:00:00 AM
Purchaser: David Dethloff Organization: Department of Transportation
Department: 7304235 - Region 4 Location: 4098 - Region 4 Manager
Fiscal Year: 26 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  10/01/2025 11:03:47 AM
Info Contact: Contact David Dethloff - william.d.dethloff@odot.oregon.gov - 503-569-8793 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: No pre bid conference established for this project
Bulletin Desc: Project scope consists of supplying all labor, material, equipment, mobilization, machinery and traffic control for replacing roadside milepost markers. Contractor shall remove, bundle and return to ODOT existing ground anchored milepost markers and provide and install new mile post markers as specified.
Ship-to Address: Region 4 Manager
63055 N Hwy 97, Bldg. K
Bend, OR 97703
US
Email: R4Admin@odot.oregon.gov
Phone: (541) 388-6180
Bill-to Address: Region 4 Manager
63055 N Hwy 97, Bldg. K
Bend, OR 97703
US
Email: R4Admin@odot.oregon.gov
Phone: (541) 388-6180
Print Format: Bid Print New
File Attachments: 00014943 Preliminary Results.xlsx
00014943 Intent To Award.xlsx
00014943 Addendum.1.docx
00014943 ESB_RFCQ_279C.docx
00014943 Exhibit 1 Technical Specifications.doc
00014943 Exhibit 2 Plans.REVISED.pdf
00014943 ESB_Attachments_279C.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Public Improvement
Procurement Method: Intermediate Procurement
Questions:
Question # Print Sequence Required Question Response
1 1.0 Yes Are you certified through COBID as an ESB firm? If you answer NO, your bid will not be considered for award of this bid.                    
2 2.0 Yes Did you enter bid pricing in the Items tab, and also complete and attach the Bid Pricing Form?                    
3 3.0 Yes Did you mark your attachments confidential?                    
Amendments:
Amendment # Amendment Date Amendment Note
1 10/06/2025 10:38:09 AM The purpose of Addendum 1 is to replace exhibit 2 plans for the project. It was noticed that sheet number LB05 of Exhibit 2 plans listed incorrect sign and sign locations. Of note sheet number LB05 is the only plan sheet that has changes. Attachment File Changes: Header 1. File '00014943 Exhibit 2 Plans.pdf': File '00014943 Exhibit 2 Plans.pdf' deleted . 2. File '00014943 Exhibit 2 Plans.REVISED.pdf': File '00014943 Exhibit 2 Plans.REVISED.pdf' added . 3. File '00014943 Addendum.1.docx': File '00014943 Addendum.1.docx' added . 4. File '00014943 ESB_RFCQ_279C.docx': Order changed from "1" to "2". 5. File '00014943 ESB_Attachments_279C.docx': Order changed from "2" to "5".
2 10/16/2025 11:58:48 AM Preliminary Results are now posted and available in the attachments tab, ODOT is reviewing for award recommendation. Attachment File Changes: Header 1. File '00014943 Preliminary Results.xlsx': File '00014943 Preliminary Results.xlsx' added .
3 10/16/2025 11:59:25 AM Preliminary Results are now posted and available in the attachments tab, ODOT is reviewing for award recommendation. Attachment File Changes: Header 1. File '00014943 Preliminary Results.xlsx': File '00014943 Preliminary Results.xlsx' added .
4 10/21/2025 08:50:15 AM ODOT's Intent To Award to lowest bidder Common Ground Excavation LLC is posted and available in the attachments tab Attachment File Changes: Header 1. File '00014943 Intent To Award.xlsx': File '00014943 Intent To Award.xlsx' added .

Item Information

1-5 of 6
1  2 
Item # 1:   ( 913  -  27 )   Temporary Traffic Control
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 913  -  27 )   Mile post Marker Posts
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
56.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 913  -  27 )   Remove Existing Signs
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 913  -  27 )   Sign Support Footings
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 913  -  27 )   Perforated Steel Square Tube Slop Base Sign Supports
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   LUMP SUM - Lump Sum    
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 6
1  2 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status