You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: S-KA0010-00018090
Time remaining
Header Information
Bid Number:
S-KA0010-00018090
Description:
Ashland Water Treatment Plant
Bid Opening Date:
11/05/2026 01:00:00 PM
Purchaser:
Scott Fleury
Organization:
City of Ashland
Department:
KA001006 - Public Works
Location:
KA002 - Engineering
Fiscal Year:
27
Allow Electronic Quote:
No
Alternate Id:
2018-20
Required Date:
11/05/2026
Available Date :
09/29/2026 01:00:00 PM
Info Contact:
Scott Fleury, 541-488-5587, scott.fleury@ashland.or.us
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Mandatory pre-bid conference for the Project will be held on Tuesday, October 13, 2026 at 10:00 AM at the Community Development building located at 51 Winburn Way, Ashland, OR 97520.
Bulletin Desc:
The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the Construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system.
Ship-to Address:
Scott Fleury
51 Winburn Way
Ashland, OR 97520
US
Email:
Phone: (541) 552-2412
Bill-to Address:
Scott Fleury
51 Winburn Way
Ashland, OR 97520
US
Email:
Phone: (541) 552-2412
Print Format:
Bid Print New
File Attachments:
WTP Bid Advertisement.pdf
City-of-Ashland_WTP_IFB-Specs_09252026-Front End Vol 1.pdf
City-of-Ashland_WTP_IFB-Specs_09252026-Back End Vol 2.pdf
City-of-Ashland_WTP_IFB-Drawings_09252026.pdf
COA Prequal Application-2025-27~2.pdf
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Discipline Type:
Public Improvement
Procurement Method:
Competitive Sealed Bid
Item Information
Item # 1: ( 913 - 60 )
The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system.
NIGP Code:
913-60
Construction, Water System, Plants, Main and Service Line
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 913 - 92 )
The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system
NIGP Code:
913-92
Maintenance and Repair, Water System, Main and Service Line
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 909 - 30 )
The City of Ashland is requesting Bids for the construction of the Ashland Creek Water Treatment Plant. The Project includes the construction of a new drinking water treatment plant including raw water conveyance, pressure reduction, chemical pretreatment equipment, filtration, filtered water storage and pumping, chemical storage and metering, water and sewer lines, and all other work described in the contract documents for a complete and functioning system
NIGP Code:
909-30
Building Construction, (Not Otherwise Classified)
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status