Bid Solicitation: S-KN0010-00016853

Time remaining

Header Information

Bid Number: S-KN0010-00016853 Description: Moore-Harney US 20 Intersection & Street Improvements Bid Opening Date: 05/26/2026 02:00:00 PM
Purchaser: Chris Beatty Organization: City of Newport
Department: KN001008 - Engineering Location: KN008 - Engineering
Fiscal Year: 27 Allow Electronic Quote: Yes
Alternate Id:   Required Date: 05/05/2026 Available Date :  05/05/2026 11:29:24 AM
Info Contact: Chris Beatty - c.beatty@newportoregon.gov Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Non-mandatory pre bid meeting schedule for May 14th at 10:00am, located at Newport City Hall, Engineering Wing, Conference Room A, 169 SW Coast Hwy, Newport Oregon, 97365
Bulletin Desc: Construction of new concrete curb and gutter, sidewalk, driveway, pedestrian ramps, full-depth pavement reconstruction, pavement cold-plane with 2-inch asphalt overlay, storm drainage, pavement markings, and landscaping features on NE Harney Street between NE 3rd Street and US Highway 20.
Ship-to Address: Chris Beatty
169 SW Coast Highway
Newport, OR 97365
US
Email: c.beatty@newportoregon.gov
Phone: (541) 574-3370
Bill-to Address: Chris Beatty
169 SW Coast Highway
Newport, OR 97365
US
Email: c.beatty@newportoregon.gov
Phone: (541) 574-3370
Print Format: Bid Print New
File Attachments: ADVERTISEMENT FOR BIDS - MOORE-HARNEY-US20 INTERSECTION & STREET IMPROVEMENTS
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Ordinary Construction
Procurement Method: Competitive Sealed Bid
Amendments:
Amendment # Amendment Date Amendment Note
1 05/14/2026 09:28:28 AM Header 1. Description changed from "Moore-Harney US 20 Intersection & Street Improvements" to "Moore-Harney US 20 Intersection & Street Improvements".

Item Information

Item # 1:   ( 913  -  27 )   Construction of new concrete curb and gutter, sidewalk, driveway, pedestrian ramps, full-depth pavement reconstruction, pavement cold-plane with 2-inch asphalt overlay, storm drainage, pavement markings, and landscaping features on NE Harney Street between NE 3rd Street and US Highway 20.
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost