You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: S-KN0010-00016853
Time remaining
Header Information
Bid Number:
S-KN0010-00016853
Description:
Moore-Harney US 20 Intersection & Street Improvements
Bid Opening Date:
05/26/2026 02:00:00 PM
Purchaser:
Chris Beatty
Organization:
City of Newport
Department:
KN001008 - Engineering
Location:
KN008 - Engineering
Fiscal Year:
27
Allow Electronic Quote:
Yes
Alternate Id:
Required Date:
05/05/2026
Available Date :
05/05/2026 11:29:24 AM
Info Contact:
Chris Beatty - c.beatty@newportoregon.gov
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
Non-mandatory pre bid meeting schedule for May 14th at 10:00am, located at Newport City Hall, Engineering Wing, Conference Room A, 169 SW Coast Hwy, Newport Oregon, 97365
Bulletin Desc:
Construction of new concrete curb and gutter, sidewalk, driveway, pedestrian ramps, full-depth pavement reconstruction, pavement cold-plane with 2-inch asphalt overlay, storm drainage, pavement markings, and landscaping features on NE Harney Street between NE 3rd Street and US Highway 20.
Ship-to Address:
Chris Beatty
169 SW Coast Highway
Newport, OR 97365
US
Email: c.beatty@newportoregon.gov
Phone: (541) 574-3370
Bill-to Address:
Chris Beatty
169 SW Coast Highway
Newport, OR 97365
US
Email: c.beatty@newportoregon.gov
Phone: (541) 574-3370
Print Format:
Bid Print New
File Attachments:
ADVERTISEMENT FOR BIDS - MOORE-HARNEY-US20 INTERSECTION & STREET IMPROVEMENTS
Form Attachments:
Required Quote Attachments
Desired Attachment Name
Description
Discipline Type:
Ordinary Construction
Procurement Method:
Competitive Sealed Bid
Amendments:
Amendment #
Amendment Date
Amendment Note
1
05/14/2026 09:28:28 AM
Header 1. Description changed from "Moore-Harney US 20 Intersection & Street Improvements" to "Moore-Harney US 20 Intersection & Street Improvements".
Item Information
Item # 1: ( 913 - 27 )
Construction of new concrete curb and gutter, sidewalk, driveway, pedestrian ramps, full-depth pavement reconstruction, pavement cold-plane with 2-inch asphalt overlay, storm drainage, pavement markings, and landscaping features on NE Harney Street between NE 3rd Street and US Highway 20.
NIGP Code:
913-27
Construction, Highway and Road
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Quote #
Description
Date Last Modified
Status