Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-KP0674-00006487

Header Information

Bid Number: S-KP0674-00006487 Description: Sewer Collection Grout and Repairs Bid Opening Date: 04/27/2023 02:00:00 PM
Purchaser: Stephanie Patterson Organization: City of Powers
Department: KP067401 - Administration Location: 001 - Administration
Fiscal Year: 23 Allow Electronic Quote: Yes
Alternate Id:   Required Date: 04/27/2023 Available Date :  04/11/2023 09:00:00 AM
Info Contact: Loree Pryce, PE email: lpryce.ess@gmail.com Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: A Non-Mandatory Pre- Bid will be April 18, 2023 at 1:00 PM on zoom. Contractors may visit the site however the meeting will be held virtually. A recording of the prebid will be made available upon request.
Bulletin Desc: Furnishing all labor, equipment, materials and supervision for a citywide sewer collection system rehabilitation and inflow and infiltration reduction project. Efforts shall include several types of non-excavation rehabilitation, environmentally friendly techniques to obtain a I/I reduction goal of 75% from current peak wet weather flows. The work will include grouting, rehabilitation and repair techniques including; UV cured CIPP lining, chemical point repair grouting,T-liner, manhole rehab
Ship-to Address: Bill-to Address:
File Attachments: Advertisement
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Discipline Type: Public Improvement
Procurement Method: Competitive Sealed Bid

Item Information

Item # 1:   ( 578  -  97 )   Furnishing all labor, equipment, materials and supervision for a citywide sewer collection system rehabilitation and inflow and infiltration reduction project. Efforts shall include several types of non-excavation rehabilitation, environmentally friendly techniques to obtain a I/I reduction goal of 75% from current peak wet weather flows. The work will include grouting, rehabilitation and repair techniques including; UV cured CIPP lining, chemical point repair grouting,T-liner or Top Hat main to lateral connections, manhole rehabilitation using approved coating/lining products, chimney and rubber seal installations, manhole lid plugs, and post rehabilitation CCTV inspection for effectiveness and warrantee. Minor excavation for 3 lateral/main connections will be required under archaeological monitoring supervision. Provide bypass pumping as required. The rehabilitation efforts are time sensitive and must be completed before rainy season 2023. CCTV post inspect shall occur after a substantial rain event late 2023 or early 2024. Condition reports and CCTV video shall be available for review. Mapping and rehab evaluation GIS shape files are available as well as condition assessment rating sheets for sewer mains, laterals and manholes.
NIGP Code: 578-97
   Water, Non-Potable
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 