| Bid Number: |
S-X21600-00013063
|
Description: |
RFP Eugene Area Office
|
Bid Opening Date: |
04/11/2025 12:00:00 PM
|
| Purchaser: |
Syd Somes
|
Organization: |
Confederated Tribes of Siletz Indians
|
| Department: |
X2160010 - Public Works2
|
Location: |
PW2 - Public works2
|
| Fiscal Year: |
25
|
Allow Electronic Quote: |
Yes
|
| Alternate Id: |
|
Required Date: |
|
Available Date
:
|
03/10/2025 08:00:00 AM |
| Info Contact: |
Syd Somes
|
Bid Type: |
OPEN
|
Informal Bid Flag: |
Yes
|
| Purchase Method: |
Open Market
|
| Pre Bid Conference: |
Meeting at 2892 Crescent Ave Eugene OR will be at 11am March 14th.
|
| Bulletin Desc: |
Purchased new building and will require modifications to the building before we can move in, currently all utilities are on and will be for the duration of the modifications. Separate RFP for electrician work has been done, dis-regard electrical work. See up loaded scope of work document.
|
|
| Ship-to Address: |
Syd Somes 201 SE Swan Siletz , OR 97380 US Email: sydneys@ctsi.nsn.us Phone: (541) 351-0141
|
Bill-to Address: |
Syd Somes PO Box 549 Siletz, OR 97380 US Email: sydneys@ctsi.nsn.us Phone: (541) 351-0141
|
Print Format: |
Bid Print New
|
|
File Attachments:
|
GC EAO Updated March 18 2025.docx
|
|
Form Attachments:
|
|
| Desired Attachment Name |
Description |
|
COI
|
Certificate of Insurance
|
|
Bid Bond
|
Equivalent to 100% of the bid price. required with proposal.
|
|
|
Discipline Type:
|
Trade Services
|
|
Procurement Method:
|
Competitive Sealed Proposal
|
|
Questions:
|
| Question # |
Print Sequence |
Required |
Question |
Response |
|
1
|
1.0
|
Yes
|
When can work begin and be completed?
|
|
|
|
Amendments:
|
| Amendment # |
Amendment Date |
Amendment Note |
|
1
|
03/07/2025 12:21:02 PM
|
Header 1. Bulletin Desc changed from "Purchased new building and will require modifications to the building before we can move in, currently all utilities are on and will be for the duration of the modifications. See up loaded scope of work document." to "Purchased new building and will require modifications to the building before we can move in, currently all utilities are on and will be for the duration of the modifications. Separate RFP for electrician work has been done, dis-regard electrical work. See up loaded scope of work document.".
|
|
2
|
03/18/2025 05:04:11 PM
|
The scope of work has expanded for the General Contractor. See updated attachment. Attachment File Changes: Header 1. File 'GC EAO Updated March 18 2025.docx': File 'GC EAO Updated March 18 2025.docx' added . 2. File 'Scope of Work for EAO General Contractor.docx': Show Attachment to Vendor Flag changed from "Yes" to "No". Required Attachment Changes: Desired name changed from Proof of Bid Guarantee to Bid Bond Description changed from Equivalent to 20% of the bid price. This bid guarantee can be in the form of a bid bond, certified check, bank draft or US Government Bonds at par value. to Equivalent to 100% of the bid price. required with proposal.
|
|