You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?
Bid Solicitation: S-24800-00003212
Header Information
Bid Number:
S-24800-00003212
Description:
COOS BAY ARMORY REGIONAL EMERGENCY ENHANCEMENT PROJECT
Bid Opening Date:
07/27/2022 02:00:00 PM
Purchaser:
Sam Goff
Organization:
Oregon Military Department
Department:
24802 - Installations Division
Location:
AGI - Installations Division
Fiscal Year:
23
Allow Electronic Quote:
No
Alternate Id:
Required Date:
Available Date :
05/18/2022 09:26:06 AM
Info Contact:
Bid Type:
OPEN
Informal Bid Flag:
No
Purchase Method:
Open Market
Pre Bid Conference:
C.1.1 MANDATORY PRE-BID CONFERENCE C.1.1.1 A mandatory pre-bid conference will be held on JUNE 8, 2022 AT 9 am (PT), located at Coos Bay Armory 255 N Norman Ave, Coos Bay OR 97420
Bulletin Desc:
The project will provide structural improvements and upgrades to the Coos Bay Readiness Center facility to Emergency Operations Center?s EOCs facility standards to withstand major seismic events or other natural disasters, per attached drawings and specifications
Ship-to Address:
Bill-to Address:
Print Format:
File Attachments:
ITB
COOS BAY BID SET DRAWINGS
Coos Bay Bid Set Specifications
Addendum 1
Prebid list
ADDENDUM 2
07 52 16 SBS Modified Bituminous Membrane Roofing
OMD Coos Bay Readiness Center EOC Upgrades - Addendum 02 Drawings
06-16-09 (5) Fire Alarm Drawings
07-15-09 5 E1 0 R 2009 07 14-Layout1 Generator Location
0637-Architectural
0637-Civil 1
0637-Mechanical
1975 Coos Bay 1701 Armory - Arch
1975 Coos Bay 1701 Armory - Struct
Addendum 3
CoosBay_HazMatSrvyRpt_20220718.pdf
PRELIMINARY RESULTS
NOTICE OF INTENT TO AWARD
Form Attachments:
Required Quote Attachments
Discipline Type:
Public Improvement
Procurement Method:
Competitive Sealed Bid
Amendments:
Amendment #
Amendment Date
Amendment Note
1
06/10/2022 09:47:48 AM
Addendum 1 updates the time for additional site visit and required bidders to RSVP prior to attending if attendance is desired. Attachment File Changes: Header 1. File 'Addendum 1': File 'Addendum 1' added . 2. File 'Prebid list': File 'Prebid list' added .
2
06/29/2022 03:14:36 PM
ADDENDUM 2 OFFICIAL DOCUMENTS AND NEW FILES MANDATORY FOR ALL BIDDERS Attachment File Changes: Header 1. File 'ADDENDUM 2': File 'ADDENDUM 2' added . 2. File '07 52 16 SBS Modified Bituminous Membrane Roofing': File '07 52 16 SBS Modified Bituminous Membrane Roofing' added . 3. File 'OMD Coos Bay Readiness Center EOC Upgrades - Addendum 02 Drawings': File 'OMD Coos Bay Readiness Center EOC Upgrades - Addendum 02 Drawings' added . 4. File '06-16-09 (5) Fire Alarm Drawings': File '06-16-09 (5) Fire Alarm Drawings' added . 5. File '07-15-09 5 E1 0 R 2009 07 14-Layout1 Generator Location': File '07-15-09 5 E1 0 R 2009 07 14-Layout1 Generator Location' added . 6. File '0637-Architectural': File '0637-Architectural' added . 7. File '0637-Civil 1': File '0637-Civil 1' added . 8. File '0637-Mechanical': File '0637-Mechanical' added . 9. File '1975 Coos Bay 1701 Armory - Arch': File '1975 Coos Bay 1701 Armory - Arch' added . 10. File '1975 Coos Bay 1701 Armory - Struct': File '1975 Coos Bay 1701 Armory - Struct' added .
3
07/18/2022 01:55:03 PM
Addendum 3 revises bid opening date and uploads HazMat report Attachment File Changes: Header 1. File 'Addendum 3': File 'Addendum 3' added . 2. File 'CoosBay_HazMatSrvyRpt_20220718.pdf': File 'CoosBay_HazMatSrvyRpt_20220718.pdf' added .
4
08/03/2022 03:57:20 PM
POSTS PRELIMINARY RESULTS Attachment File Changes: Header 1. File 'PRELIMINARY RESULTS': File 'PRELIMINARY RESULTS' added .
5
08/18/2022 01:20:01 PM
POSTS OFFICIAL NOTICE OF INTENT TO AWARD Attachment File Changes: Header 1. File 'NOTICE OF INTENT TO AWARD': File 'NOTICE OF INTENT TO AWARD' added .
Item Information
Item # 1: ( 909 - 22 )
SEE ITB DOCUMETNS
NIGP Code:
909-22
Building Construction, Non-Residential, Office Bldg., etc.
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 2: ( 909 - 24 )
SEE ITB DOCUMENTS
NIGP Code:
909-24
Building Construction, Commercial and Institutional
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
Item # 3: ( 909 - 30 )
SEE ITB DOCUMENTS
NIGP Code:
909-30
Building Construction, (Not Otherwise Classified)
Qty
Unit Cost
UOM
Total Discount Amt.
Total Cost
1.0
EA - Each
Manufacturer:
Brand:
Model:
Make:
Packaging:
OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
Quote #
Description
Date Last Modified
Status