Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-KB0020-00013860
Header Information
Bid Number: S-KB0020-00013860 Description: Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124 Bid Opening Date: 06/05/2025 02:00:00 PM
Purchaser: Michael Phillips Organization: City of Beaverton
Department: KB002001 - Finance Location: KB002 - Procurement
Fiscal Year: 25 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  05/14/2025 02:29:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: Pre-Bid Conference (Non-Mandatory):May 21, 2025, 10:00am https://www.zoomgov.com/my/beavertonprocurement
Bulletin Desc: INVITATION TO BID FOR THE CONSTRUCTION OF Lisa Ln. (141st - Bonnie Brae) Waterline Replacement Project, CIP 4124 Solicitation # 25-156 2.1. DESCRIPTION OF PROJECT the City of Beaverton will only accept electronic bids for the project via the City's e-Procurement Portal at https://procurement.opengov.com/portal/beavertonoregon, Project No. 25-156. The project cost is approximately between $ 1,100,000 and $ 1,300,000.
Ship-to Address: Bill-to Address: Print Format: Bid Print New
Required Quote Attachments
Discipline Type: Public Improvement
Procurement Method: Competitive Sealed Bid
Item Information
Item # 1:   ( 913  -  00 )   The City of Beaverton will only accept electronic bids for the project via the City's e-Procurement Portal at https://procurement.opengov.com/portal/beavertonoregon, Project No. 25-156. The project cost is approximately between $ 1,100,000 and $ 1,300,000. This project will replace approximately 1,700 feet of 6-inch cast iron water main, originally installed in 1965, with seismically resilient 6-inch ductile iron pipe. The existing cast iron main has experienced several breaks in recent years, exacerbated by corrosive native soils, leading to a significantly shortened service life of both the pipe and fittings. Recognized as a top replacement priority by Water Operations staff, this project will also include: Replacement of all water service lines between the main and meter Installation of Advanced Metering Infrastructure (AMI) meters Replacement of all fire hydrants within the project limits
NIGP Code: 913-00
   CONSTRUCTION SERVICES, HEAVY, INCLUDING MAINTENANCE AND REPAIR SERVICES
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2025 Periscope Holdings, Inc. - All Rights Reserved.
OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
Quote # Description Date Last Modified Status