Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: S-KS0043-00013612
Header Information
Bid Number: S-KS0043-00013612 Description: 245118 Laurel Avenue NE Waterline Replacement Bid Opening Date: 05/13/2025 02:30:00 PM
Purchaser: Fabiola Mora Organization: City of Salem
Department: KS004302 - Engineering Location: KS004 - Engineering
Fiscal Year: 25 Allow Electronic Quote: No
Alternate Id: 0  Required Date: 04/16/2025 Available Date :  04/16/2025 12:30:00 PM
Info Contact: Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference: No Pre-Bid Conference is scheduled for this project.
Bulletin Desc: Engineer's Estimate $375,000 to $475,000.
Ship-to Address: Mary Kopp
1457 23rd Street SE
Salem, OR 97302
US
Email: mkopp@cityofsalem.net
Phone: (503) 588-6211
Bill-to Address: Mary Kopp
1457 23rd Street SE
Salem, OR 97302
US
Email: mkopp@cityofsalem.net
Phone: (503) 588-6211
Print Format: Bid Print New
File Attachments: 245118 Bid Tabulation
245118 Intent to Award
245118 Project Manual
245118 Final Plans
Bid Opening Zoom Link~3.pdf
245118 Bid Register with Rank
Form Attachments:
Required Quote Attachments
Discipline Type: Public Improvement
Procurement Method: Competitive Sealed Bid
Amendments:
Amendment # Amendment Date Amendment Note
1 05/05/2025 09:51:54 AM Bid Opening Zoom Link Attachment File Changes: Header 1. File 'Bid Opening Zoom Link~3.pdf': File 'Bid Opening Zoom Link~3.pdf' added .
2 05/13/2025 04:02:40 PM Attachment File Changes: Header 1. File '245118 Bid Register with Rank': File '245118 Bid Register with Rank' added .
3 05/28/2025 09:17:01 AM Attachment File Changes: Header 1. File '245118 Bid Tabulation': File '245118 Bid Tabulation' added .
4 05/28/2025 02:41:32 PM Attachment File Changes: Header 1. File '245118 Intent to Award': File '245118 Intent to Award' added .
Item Information
1-5 of 7
1 2  
Item # 1:   ( 670  -  53 )   Laurel Avenue NE Waterline Replacement
NIGP Code: 670-53
   Pipeline Equipment and Tools, Construction and Laying of the Pipeline
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 914  -  68 )   Laurel Avenue NE Waterline Replacement
NIGP Code: 914-68
   Plumbing
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 3:   ( 913  -  62 )   Laurel Avenue NE Waterline Replacement
NIGP Code: 913-62
   Construction, Concrete, Pour-In-Place, Form, Place, Finish
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 4:   ( 914  -  30 )   Laurel Avenue NE Waterline Replacement
NIGP Code: 914-30
   Concrete
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 5:   ( 745  -  21 )   Laurel Avenue NE Waterline Replacement
NIGP Code: 745-21
   Asphaltic Concrete, Hot Laid Including Bituminous Materials
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   EA - Each    
Manufacturer: Brand: Model:
Make: Packaging:
 
1-5 of 7
1 2  
Copyright © 2025 Periscope Holdings, Inc. - All Rights Reserved.
OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
Quote # Description Date Last Modified Status